Slow cooked a couple of
slabs of spareribs overnight. Ty and Ian
put on the west side roof sheathing, then the 9″ trim piece at the roof edge on
the north side. They secured a tarp over
the roof peak vent using the last of my antique staples (1976 vintage). Sean, Luther, Fred, and Perry (until noon) worked
on building the roof structure over the Sun Room. Taylor Rental called to say that the problem
with the log splitter was that I had overfilled the gas tank. Hmmm…
Taking out my frustration, I widened the opening into the flue pipe
inside the chimney cleanout to accommodate an 8″ brush (Kevin had sawn that
opening 6″ wide for some reason.) Then
Chree and I did some site and RV cleaning because… John and Mary Jane Cuneo arrived
mid-afternoon for a two-day visit. The
spareribs, further cooked over the campfire, went down in a hurry after a
lengthy swim and paddle around the lake!