Perry and I continued
the sauna building construction during an absolutely gorgeous day for working
outside. By 5 o’clock all the exterior
walls were upright, plumbed vertical, and braced in that position. We also put up the 4 x 6 PT post
that will support the southwest corner of the building. After hurriedly picking up the property in
anticipation of overnight rain, taking a quick shower, and gobbling down some
dinner, went over to Kate’s at 6 for appetizers on her deck. Had to leave at 6:30 ‘cause… mid-afternoon,
got a call from our condo tenant reporting that sparks had been observed
shooting out of a switch controlled electrical outlet… that had nothing plugged
into it. I think that falls into the
“Not Good” category. Got to Burlington
at 8 and found a charred outlet, a switch with some very bizarre wiring, and a
situation beyond my abilities to correct.
Our tenants very graciously invited me to stay for a very late but very
delicious dinner. Returned to Fern Lake
just before 11 and was in bed asleep literally minutes later.