Jimmy and Wink Rhodes
(Ploof Excavating’s driver, loader operator, and man about town) started work
at 0730. Wink spent the morning hauling
loader bucket after loader bucket of “extra” gravel from the house site to fill
in the dip in our driveway. The driveway
now has a nice even, and much more benign, pitch for the first 200 feet. Jimmy continued digging his way towards
China. Tammy, Nate, and Mary came at
0830 to recommence work on the sauna building site retaining wall. The four of us had the wall complete, the
sauna’s French drain installed, and the Kubota safely returned to its garage by
3:30. Jimmy finally quit for the day at
6:30. Black flies were pretty miserable
in the afternoon.