Right after breakfast sat
down with my house design computer program and a fresh brain, made a few tweaks
to the size of the pantry, slid the doorway to the living / dining room a foot
to the east and, voilá, we had a kitchen design that both Chree and I
like. Used the Kubota to reopen the
trench that Alex dug on Friday, then ripped out the conduit and wires from the
house to the head of the walkway. With much hard work plus many a swear word,
eventually got the reducer out of the wall so that a ¾″ PVC conduit can be
inserted… as per the original concept.
VERY carefully used the backhoe to dig down (and down, and down) between
the wire that keeps Delores in electrons and the conduit that currently feeds
power to the woodshed, finding the ends of the 3″ (main power from the panel to
the house) and the two 2″ (telephone and cable TV) conduits right where we left
them in 2009. Then Chree took over
excavation duties and extended the trench down the hill and around the corner
towards Grandma’s house. In between all
the dirty fun, cleaned and straightened up the basement… ‘cause you know how
fussy them geese are. The lake level is
6½″ below the top of the dock and still pushes the thermometer up to 75°, which
felt pretty darn good!