Sonny and Ian went on
another staging raid en route Fern Lake, bringing the final pieces needed to
finish the third buck all the way across the west wall. They then spent the day shingling while I cut
and stained per their requirements. I
also cut in the KOMA® blocks for the exterior light that will go
above the shop door and for the exterior weatherproof electrical outlet that
will be next to that door. In typical
good-service fashion, Goodro’s delivery truck showed up less than 3 hours after
I ordered some more KOMA® for the frieze boards. Larry Kaufmann
(owner of Long Ridge Concrete) came by late afternoon to repair the north
foundation wall crack that manifested over the winter. After Larry dug down to the footer, we
applied an adhesive membrane over the crack that, Larry assures me, will keep
any water from penetrating through the wall.