21 January 2016

Sonny and Doug say that, after a day putting radiant floor pans up, they’re going to charge their chiropractic visits to the project.  Completely understandable!  Steve spent most of the day connecting pieces of the plumbing drainage system together.  Shawn Lathrop and Luke Charlebois from Peck Electric came to install the electrical subpanel in the pantry that will power all the house main level circuits.  Unfortunately, they brought the wrong panel, the wrong wire, and didn’t have with them the 125 amp circuit breaker needed to isolate the subpanel from the main panel down in the utility room.  So, after measuring to make sure they knew how much wire would be needed to connect the two panels together, they left to regroup.  Dennis came by right after lunch to review the plumbing and ductwork progress and answer questions.  He quickly figured out a solution to the problem of how to get radiant floor heating under a portion of the master bathroom shower that was stuffed full of HRV ducts.  (Answer: remove the ducts, install the radiant floor pans, and then reroute the ducts in a soffit extension through the shop lavatory.  Guess this is why Dennis makes the big bucks!)  I spent the day putting in outlet and switch boxes, then drilling holes through which wiring will be run to those boxes.  Got the second guest bedroom, the guest bath, and the lower hall mostly done.  Steve and I also figured out how to route the exhaust from the guest bath fan so that malodorous vapors don’t get sucked back into the HRV supply piping.  Not, mind you, that I’m accusing any sons of ours of ever creating malodorous vapors…  Late afternoon, made a raid on Green Mountain Electric Supply for another 2,000 feet of wire, plus other accoutrements.  It’s a good thing we have a healthy upper limit on our VISA® card.