6 July 2018

After seven days of watering, pulled off the HydraCure® membrane to find a beautiful (and uncracked) concrete slab.  Using my angle grinder, cut the rebar pins down to their proper sizes, i.e., 9½″ for the curbs and 29½″ for the walls.  As new concrete does not bond with concrete that has already set, those pins will keep the curbs / walls from moving laterally (or vertically, for that matter) on the floor slab.  After a brutal week of 90°+ air temperatures, the lake water temperature is up to 84°, the warmest that I have ever observed.