13 July 2017
Friday the 13th started out with me
having just barely (literally and figuratively) rolled out of bed when Brett
and the Goodro’s trucked pulled in, bearing the 2x6 PT lumber needed for the
barn sole plates. Dressing quickly, got
out to the job site just as Brett finished unloading. Darn the luck! After errands in Middlebury, finished parging
the dirt-side south wall / floor slab seam.
Chree having gone to Rutland shopping, the parging went much better with
lots of inappropriate verbal “encouragement”.