A quick trip to Goodro’s made me the richer by
one 6″ J-bolt (the J portion of which soon was cut off, leaving a ½″ galvanized
threaded rod 5½″ long), some 3,200 psi Gorilla® glue epoxy, and a
new ½″ concrete drill bit… plus the 2½″ star-drive wood walkway screws that I
ran out of yesterday. Literally a few
minutes after returning to Fern Lake, the missing sole plate tie-down bolt had
been drilled and glued into place. Doing
the math, the pulling force that that bolt should be capable of withstanding is
more than 7 tons. Thing that’ll do! Then got out the Kubota and backfilled and
graded the north and east sides of the barn foundation.