3 February 2016

Sonny and Doug put up the ceiling sheetrock in the upper hall, master bedroom, and walk thru closet.  Tom and I wired hither and yon.  Steve continued doing his plumbing thing.  At 4:20 I burned rubber to get to Green Mountain Electric Supply before they closed at 5.  Got there just after 4:30 and the door was locked… ‘cause that’s when they close.  But Jordan Steele, the manager, let me in anyway, which enriched his company by several hundred dollars.  From there I headed to Burlington, stopping for a Big Mac, fries, and vanilla shake fix en route.  Lowe’s had only one of the six Square D QO 20 amp AFCI and GFI circuit breakers and only two of the 4 round ceiling boxes I desperately needed.  Bother!!!!  Stopped for awhile to visit with Alverta on my way back south.  Got back to Fern Lake at 9, just in time for bed.