19 February 2016

Ty, Sonny, Doug went crazy all day putting up sheetrock on the inside of the exterior walls on the main level.  Steve continued building his piping labyrinth in the mechanical room.  Think he may be trying to rival the hydra monster that Tom Hobbs built with the air handler and HRV ductwork.  I left at 7:30 for appointments in Burlington, and then, because I was already there, provided transport back to The Residence and got Alverta resettled after an overnight stay at the UVM Medical Center.  That latter task took the entire afternoon.  Finally got back to Fern Lake at 6, having stopped en route for a Big Mac lunch / dinner in Ferrisburg.  Boy did that burger taste GOOD after having eaten nothing since breakfast.