Spent the morning putting in the rest of the 1½″ PVC conduit in which the sauna building ½″ PEX water line will be run. Finding decent soil with which to cover the
conduit was a time-consuming challenge, even using the Kubota to cheat like
crazy. Spent the afternoon cutting /
splitting / stacking firewood. Got to within
a dozen pieces of finishing the 5th row (out of 7) in the north side
of the woodshed.