11 October 2014

Spent the morning putting in the rest of the 1½ PVC conduit in which the sauna building ½ PEX water line will be run.  Finding decent soil with which to cover the conduit was a time-consuming challenge, even using the Kubota to cheat like crazy.  Spent the afternoon cutting / splitting / stacking firewood.  Got to within a dozen pieces of finishing the 5th row (out of 7) in the north side of the woodshed.