Jimmy arrived at 8:30 and set me to work scavenging
wall building rocks from around the property, while he continued stacking them
one upon the other. Found a dozen in the
300 to 1,000 pound range, dug them out with the backhoe, and hauled all but the
two largest to the work site with the Kubota.
At lunchtime Jimmy went over to his gravel pit and brought back 3 more rocks
in the multi-ton range. That should give
us enough to finish the wall, which stands just over 11 feet high at its apex. From the house to the wall measures 50 feet…
we are going to have one heck of a croquet court! Sean stopped by again this morning to admire
our creation. Kevin and Brian showed up
at 3:30 to take away their metal forming trailer, promising to return first
thing Monday morning. At the end of the
day, Jimmy dug the trench from the house down to where the sauna building waterline
conduit now ends. I need to put 1½ ″ pipe in that trench; he dug it 3 feet
wide! Think it’ll fit?