After 3 years of not
having a proper home, Perry and I moved the Kastor KS-20 sauna stove into its
final resting place atop the gravestone hearth.
Perry figured out the layout for the soffit outlooks. Then I cut and he and I installed the 40+
outlooks; Perry also put up additional framing for the soffit that will be
under the wide overhang where the building’s exterior door is located. I went to Goodro’s to get 5 sheets of ½″ MDO
to be used for the soffits and then put a first coat of paint on those
sheets. At the end of the work day Perry
and I applied Zip Tape to all the sauna building roof seams and rolled them
down T∙I∙G∙H∙T. That baby had better not
leak!