2 September 2014

Perry adjusted the seat cut on one additional rafter, then made all the plumb and level cuts on the sauna building rafter tails.  He then installed the 2x6 sub-fascias.  Using just three pieces of the “scrap” ⅝″ Zip System sheathing left over from the house construction, he put on the north side of the sauna building roof.  Mr. Blockhead, while all the foregoing was going on, installed all but six pieces of the wall blocking inside the sauna room.  The quality-control inspector discovered one hurricane tie attached to the wrong rafter and two others which had not been fully nailed into position.  Hmmm…