18 September 2014

Jeff Many came back to (in theory) quickly finish the garage door install.  I dipped another batch of shingles while he was doing his thing.  After awhile, he came down the hill to tell me that his distributor had sent him the door opener hardware for 7 foot high doors, not the 8 foot doors we’re putting in.  Jeff was most perturbed about the screw up and promised to return as soon as the right hardware arrives.  I packed up and headed to Burlington to do errands and drop off the sick air compressor at Burlington Tool Repair (which is actually in Essex Junction).  Took Alverta out to lunch and shopping for a new telephone to replace one of hers that recently died mysteriously.  Borrowed Perry’s air compressor on the way back to Fern Lake.