A very hot and humid
day! Sean, Ian, and Perry started work
on putting up the Main Level ceiling joists, which, in the heat, was not nearly
as much fun as it could have been. Chree
and I ran errands in Brandon, then spent some time with Tim Comes at Goodro’s,
designing the French doors for the Sun Room, getting ideas for the main entry
door, and narrowing down possibilities for the Sun Room skylights. We got back to Fern Lake just as the guys
were finishing lunch. After our own lunch, we went down to the lake with the
dogs to pull out of the water all the trees and branches that the beaver put
there on Sunday. A tough job, but
someone had to do it!