Cut and installed the
kick plates on the remaining two walkway sections that were barren of that
architectural detail. Then cut and
installed, with minimal fuss, the piece of railing for the Halfway Bench
landing that defeated me last fall. (See
blog post for 8 October 2012.)
Discovered two more items (my 2½ gallon gas can and electric pad sander)
missing from the Vermont inventory ‘cause Mr. Booby left them behind in
Virginia. Grrrrr!!!!! Swam across the lake and back. Marty brought his brother, Sid, up for a tour
as I was finishing dinner… and really enjoying a Labatt Blue.