27 August 2013
Surveyed the walkway
so I could accurately draw it on the site plan that has to be submitted with
the Building Permit Application for the Dock Building and Walkway. Got that done just as the Fyles Brothers
truck arrived to deliver 7.2 gallons of propane (all that had been used since
the last fill up at the end of May).
Then started ripping old deck planks into 2 x 2½ ″ boards that will
become kick plates for the 195 feet of the walkway that still need that
component. Was just finishing up that
task when the FedEx truck arrived at 12:45 with the tools Mr. Booby left behind
in Virginia. Thus was able to smoothly
transition to installing said kick plates onto the section of walkway between
landing #7 and the waterfront. Finished
that section, then cut and installed the mounting board for the lower transformer,
just before heeding the siren call of the warm and placid waters. Swam across the lake and back without pausing
to rest on the western side.