Note in the picture that the beam above the
completed walkway has been painted with low headroom warning stripes. Even though I absolutely knew there was only
5′ 1″ clearance between the beam and the walkway, that didn’t stop me from
smacking my nose on the beam, drawing blood, while finishing installing
electrical wiring and fixtures. About
the same time, one of my best screwdrivers went missing out of my tool
belt. Searched the piles of cellulose
insulation alongside the walkway to no avail… you could probably hide a body
under that stuff and never find it.
Sometime later, while applying paint masking tape to the beam, dropped
the roll… which landed right next to the missing screwdriver. What are the odds?!?!