18 April 2016

Chree, the dogs, the Kubota, and I returned to Fern Lake shortly after noon to find Sonny and Brandon busy installing window casings and Tom putting down the underlayment in the cedar closet, coat closet, laundry, and wine cellar nook where slate flooring will be installed.  Dennis Senesac had been by earlier to look at the geothermal heat pump noise-abatement enclosure and take amperage readings.  After unloading the truck, I went down to Vermont Specialty Slate to retrieve the rest of the slate flooring.  Chree and I got a good workout moving that load from the truck into the master bedroom.