Doug
was here shortly after 6:30… so much for sleeping in on a Saturday. With me doing the cutting in and caulking and
Doug doing the rolling, by 11 we had put almost two coats of primer on the shop
walls and soffits. “Almost” because I
had procured 4 gallons of paint and we really needed 4¼. I’ll fix the holidays with the next painting
session, scheduled for some time this coming week. After lunch, I took the snow blower off the
tractor, put the backhoe back on the tractor, moved the backhoe outside the
woodshed garage, took the backhoe back off the tractor, put the front loader on
the tractor, used the forks to move the snow blower into the woodshed garage,
put the 3-point hitch on the tractor, loaded the tractor onto the trailer, and
gathered together all of my logging paraphernalia… all in less than two
hours. This guarantees, by the way, that
we will get 2½ feet of snow week after next.