So
I was eating breakfast at 6:30 when I noticed, observant person that I am, that
all the lights were on over at our new house.
Abandoning nourishment in favor of security, went over to investigate,
discovering that Kaleb Roberts, Matt Pratt, and Brendin Roberts from Ryan’s
Quality Painting had arrived to prime the main level walls. Seems they like to start work at 6… No screwing around with these guys: Kaleb and
Matt wielded 18″ rollers while Brendin worked hard to stay ahead of them doing the
cutting in. Eric got here at 7 and
worked on applying the third coat of joint compound to the lower level
walls. He had done as much as he could
for today and left at 2, along with Matt.
The two Roberts brothers stayed another hour to finish the painting. I went into Middlebury late morning to return
the dehumidifier to Taylor Rental and meet with our National Bank of Middlebury
loan officer, Beth Buckman, to do the closing on our construction loan. To make a very long story short, Beth came
out to Fern Lake on her way home at the end of the day to have a tour of the
premises… and bring me all the corrected papers so that we could finish the
signing process. Jeffrey Many arrived
soon after Beth and quickly replaced the broken shed garage door control wire,
for which work, once again, he refused payment.
In and around the loan meetings, I wired in a temporary light and switch
in the master bedroom, moved all the extraneous “stuff” out of the shop and
into the storage room, and totally clogged the shopvac filter three times while
removing dust from the main level floors.