Ian and Doug here promptly at 7. Doug spent an hour putting in the rest of the
kitchen wall cabinet blocking while Ian built a wall for one end of the shelves
that will be in the upper hall. I
installed the new and improved (i.e., properly planned) version of the clothes
pass-thru from the master bath to the laundry.
Came out pretty good, too! Then
Doug went on a search and destroy mission for places that still needed nailers,
while Ian and I built the arches for the doorways between the living / dining
room and upper hall, mud room and kitchen, and kitchen and living / dining
room. That took most of the rest of an
abbreviated day; the guys left at 3 for the Goose Creek holiday party… to which
I was not invited. Too bad, so sad! Other than building the vaulted ceiling for
the sun room, the main level is completely framed and blocked… at least until
Sean inspects on Monday. A major
milestone, that! After the guys left, I
filled the roller with water and made several passes up and down Kate’s
driveway. A half ton of pressure drives
the rocks right into the dirt!
Hopefully that means the replacement snow blower shear pins I got the
other day won’t be needed. Of course,
because I just spent $5,000 on a new snow blower, the temperature today was
almost 60°… and is forecast to
be in the 50’s all of next week. Winter,