8 May 2015
While Tom & Tim
were busy this morning finding another 44 gpm at the bottom of a second 80′
bore hole, I paid a visit to Champlain Valley Orthopedics to find out that what
I thought ails me (old age) is, in fact, what ails me. I suggested a 9mm treatment plan, but the
physician’s assistant ordered a refill of my Vitamin I horse pills plus a
cortisone shot in my hip. Went to the
Hannaford’s pharmacy to pick up the Ibuprofen, only to have Tricare (the
military heath care insurance plan) reject payment. After being passed to three different people
in three different organizations, finally discovered that the Social Security
Administration had informed the Department of Defense that all new Medicare
recipients with January birthdates had a Medicare Part D (prescription drugs)
supplemental insurance plan. Very much
not true! By the end of the day, my DoD
file had supposedly been corrected. Our
government at work! Back at Fern Lake,
Goodro’s delivery truck showed up just as Spafford’s was pulling out, creating
a small traffic jam. This delivery was
all the rest of the materials for the Sauna deck. Based on the cost, I’ll probably have to take
a damage deposit before allowing anybody to actually walk on the deck. Unfortunately, the twenty very floppy
20′ long Clubhouse Brookstone 5/4 x 6 PVC deck planks (better living through
chemistry) had to be moved from the top of the wooden walkway down to the sauna
site by hand. Not the most fun hour I’ve
ever spent. On a positive note, with the
outside temperature in the mid-80’s (and
90° inside Delores), the house basement was a cool and inviting 66°. Now if only the lake were the same
temperature!