3 May 2015
As to be
expected, ran out of the special 9 gauge by 1½″ nails used for putting on
hurricane rafter ties with two (of the six) rafters not yet fully secured… and
Goodro’s is closed on Sundays. Scavenged
five pieces of destined-for-the-burn-pile Advantech Zip System®
sheathing and cut them to size for the Sauna Woodshed roof. Installed the top three pieces and clamped
the bottom two in place to make sure they fit.
An absolutely gorgeous day, far too nice for working, so it’s a good thing
I didn’t get much done… maybe. Or maybe
I just was dehydrated, ‘cause an end-of-day G&T sure is sliding down easy.