The correct way to put
on flashing is to install the flashing, then the siding. Spent several hours this morning trimming off
the bottom course of cedar shingles on the south end of the Sauna building,
then trying to slide 8″ aluminum flashing up under the next course, with “good
enough for government work” or “looks good from Marty’s house” success, i.e.,
minimal. Then spent the rest of the day
(when not gabbing with Tom & Tim) trying to figure out how a flat deck in
front of the Sauna is going to smoothly intersect a sloped walkway. Started cutting to length the 2x6 pressure
treated rim joists for the deck, discovering that much of a pile of them
critters salvaged from an old (but good????) deck have become infested with
white mold… which has rotted the wood.
Meanwhile, Tom & Tim moved their drilling rig to the spot for the
second well, got set up, and put 40 feet of casing pipe (2 lengths) in the
ground by quitting time. Next length
should be back into water, he says optimistically. Down to Marty & Merry’s for another
fabulous repast, fetching along a delicious bottle of 2013 Schmitt Söhne
Riesling.