8 October 2012
Knew I had just enough 2x4x12’s for the railing between
the third walkway landing and the Halfway There landing, with maybe two inches
to spare. Where the last two pieces of
railing in that section joined was a three axis compound joint… never an easy
task. Must have walked up and down the
walkway between that joint and the radial arm saw a dozen times, cutting the
angles wrong and wrong again.
Ultimately, the last piece of wood became too short to use, so I gave up
in disgust until next spring. Someone is
NOT a happy camper!!!! At noon tried to
send a simple email to Chree and Verizon, in their infinite big-brother-is-watching
wisdom, declared it to be spam and refused to send it. Then, when I tried to protest that decision
via their spamdetector.update@verizon.net email address, I kept getting a
message that that address was invalid.
So I spent an hour online chatting with some techie in India, who, after
taking control of my computer, was completely unable to replicate the
problems. As soon as we hung up (you guessed
it!) any email I sent to Chree was declared spam anew. Needless to say, the Riunite Lambrusco is
taking a serious hit tonight.