6 October 2012
Got an early start in order to get as much done as
possible before the forecast rain started (at 10:45). Cut and installed the rest of the bench seat
supports, installed the four longitudinals for the bench seat landing, put up
the next walkway light in the series, double bagged the low voltage wire reel
for outdoor winter storage, and got half the deck boards for the landing cut
and screwed down. Marty, Graham, and
Gabby stopped by to inspect progress.
Graham, at least, thinks I’ve gotten a lot done since their last visit
in mid-August. While it were raining, further refined the waterfront
construction plans, made a small repair to the RV stove, and then cleaned under
the cook top, where the mice had obviously been going to keep warm... or
something. For those of you who ate food
this summer prepared on that stove, let’s just say that I’m so sorry! At 4 o’clock the rain stopped and the sun
came out, so went back to work on the walkway, finishing the landing deck board
installation before it got dark.