13 August 2019

Removed, disassembled, and cleaned up the front entry steps concrete pad 2x4 form.  Backfilled around the edges of the pad and replaced (poorly) the front walkway slate disturbed during this latest bout of construction.  That walkway, too, was falling apart and already on the list to be rebuilt.  Spent a couple of grueling pre-lake hours (oh, my aching back!) this afternoon chipping off all the PL300 construction adhesive on the 20 front step gravestones, using my Rockwell Sonicrafter® tool, which happens to have a special attachment made just for that purpose.