The barn concrete floor being completely dry
(finally), got the seven pieces of 1x4 Koma® trim that I’ve been
storing since last summer ready for painting.
Much easier to put a first coat on those pieces with them laying flat on
saw horses than once installed at the top of the exterior walls. Calculated that I won’t need one of the 18
foot pieces of Koma. Riiiight!!!! Maybe I shouldn’t be in a rush to return that
piece to Goodro’s for credit… After putting
the trailer and snow blower back inside the barn, moved the cupola into the
barn as well so that I could put on the final top piece (a small piece of lead
that had to be trimmed to fit) and the base for the flying pig weather vane.