22 July 2019

Mike Many told Chree (during her morning perambulation) that the cupola metal roof is done.  So called Mike this afternoon to arrange a retrieval time tomorrow.  With the relative humidity finally below 70% (it’s been at 98% for the last three days), put the second (and final?) coat of silane sealer on the barn concrete floor.