5 June 2015

Tom Williams called to say that the wells passed their 72 hour test with no problems.  In order to prove that the wells are viable for a geothermal energy exchange system, we had to pump out of the supply well, and back into the return well, at 20 gallons per minute for 72 hours.  Doesn’t sound like much until you do the math and realize that’s 86,400 gallons of water.  Also today, the Vermont Agency of Natural Resources Department of Environmental Conservation Drinking Water and Groundwater Protection Division issued Permit Number WW-9-1330-1, giving us permission to site our wells, septic tanks, and leach field where we want them.  Very timely!