6 May 2013
My least favorite part of building the walkway has got to be cutting the railings. As a former Type A (well, okay, maybe not so former), it drives me crazy every time I miscut a piece, which happens ALL THE %^$#!@! TIME with the railing. In spite of that frustration and lots of exercise going up and down the walkway, got the railing caps, mid-span verticals, railings, and toe caps put onto the section between landings #5 and #6, which means that section is d-u-n!