30 September 2012
A nasty, rainy day, so spent the morning doing
inside repairs and cleaning (including fixing the wall clock, which I thought
had bit the big one on initial inspection) and inventorying the supply of wood
walkway nuts, bolts, and screws, so I’ll know what to order for the renewal of
construction next spring. Without help
from Johnny Walker, moved two mice from the utensils drawer to their new
home under the stump in the Silver Lake parking lot. After lunch drove back to Shelburne to
retrieve the laptop.