18 June 2012
The architect insists
that the rock roof in the man cave must be roughened in order to achieve the
desired ambiance. Other than that one
trifling detail, the SHED IS D•O•N•E, done!!!!
Perry came over at 9. With our
previous practice, took us no time at all to hang the two doors for the
northern doorway. After some minor
planing and sanding on the hinge sides they fit the opening nearly perfectly! Only one minor malady: the north door is
warped about ¾″ out of true at the top where it doesn’t meet the south
door. Oh, well, it is what it is at this
point; there isn’t that much adjustment in the hinges. Installed the north doorway door stops then
used Perry’s power planer to make them and the south doorway door stops look
nice and pretty. Cleaned up the shed,
ready for inspection. To celebrate, swam
across the lake and back, which is somewhat over ⅓ mile for the roundtrip.