18 June 2012


The architect insists that the rock roof in the man cave must be roughened in order to achieve the desired ambiance.  Other than that one trifling detail, the SHED IS D•O•N•E, done!!!!  Perry came over at 9.  With our previous practice, took us no time at all to hang the two doors for the northern doorway.  After some minor planing and sanding on the hinge sides they fit the opening nearly perfectly!  Only one minor malady: the north door is warped about ¾″ out of true at the top where it doesn’t meet the south door.  Oh, well, it is what it is at this point; there isn’t that much adjustment in the hinges.  Installed the north doorway door stops then used Perry’s power planer to make them and the south doorway door stops look nice and pretty.  Cleaned up the shed, ready for inspection.  To celebrate, swam across the lake and back, which is somewhat over ⅓ mile for the roundtrip.