12 September 2011
When last we heard from the Master Mason, there were five between-column rock wall sections on the east side of the shed lower level that were incomplete, with approximately 36.7 cubic feet of wall remaining to be built. By the end of the workday, that number was down to 32.9 cubic feet. Woo Hoo! Junction Auto came and took away the Ranger. Chree says she sees $$$$ in her future. Did the financial math over lunch and determined that I don’t have enough money to finish the shed this year… a major disappointment. Should be able to get everything done with materials already on hand except for the cedar shingle siding and the two big doors on the west side. Lake temperature now a refreshing 75 degrees. Over to Marty & Merry’s with Perry for another fabulous repast, featuring two of Merry’s signature dishes: orzo with roasted vegetables and cranberry salad.