6 May 2016
Jason and Brett
arrived somewhat before 6, per their usual routine. By the end of their workday they had finished
repainting the trim in the sun room, kitchen, living room, and half bath… all
areas where the walls have not been color coated yet. (Obviously it’s a lot easier to paint the
trim if you don’t have to worry about getting a little paint on the
walls.) The Chantilly Lace is the perfect
trim color. Whew!!!! Speaking of color: first thing this morning I
opened the cans for the half bath and study walls and painted on a medium-sized
square. The half bath color (Nature’s
Gift… and, honestly, who comes up with these paint names????) looks fine… and
it’s a good thing we decided to go two shades lighter than the original selection. The study color (called Stunning Gold, which
looks to me more like Stunned-by-a-Pumpkin) Chree loves and I can’t live with,
so there’s going to be some more inter-spousal discussion about that choice. Sonny and Brandon spent the morning putting casing
around the radiant heat manifold inset and baseboards in the storage room. In the afternoon they started making closet
shelves out of ¾″ 2-sided MDO which, because it is a plywood, has to be faced with ¾″ x ¾″ poplar on what will be the exposed front edge. They also cut the 1¼″ diameter pine closet hanging rods to approximate lengths, then turned
them over to me for sanding and varnishing.
After much feet-dragging, I finally agreed with Sonny that the
sentimental from-our-property maple boards are just too twisty to be used for
the interior door thresholds, with maybe one exception. Sonny ordered fresh, kiln-dried maple stock
from Goodro’s. Steve did some more
plumbing for the under-stairs hot water heater and then started on connecting
the de-super heater tank in the mechanical room to the geothermal heat
pump. He also put in the valves so that
there now is water down at the sauna through the PEX tubing we ran the other
day. Steve put in a purge valve
(actually just a hose spigot) in the shop, so that in the winter I can drain
the sauna water line and (fingers crossed) keep any more freeze-ups from
happening. Chree left late morning to
spend Mother’s Day weekend with her parents in Connecticut. I put up all but one of the rest of the shop
lights… and discovered upon throwing the switch that the last light in the
string is not working. Checked all the
connections in the surrounding lights and replaced the miscreant, all to no
avail. I’m sure Tom will want an
electrical challenge when he returns to work on Monday. In addition to varnishing hanging rods, in
the afternoon I installed about half of the living / dining room lights, all of
which worked just fine.

5 May 2016
Brett and Jason
arrived a few minutes before 6. I
boogied over to the house to find they were preparing to paint some more
trim. Put a stop to that and called Tim
Ryan, who was, to put it mildly, not at all happy to hear that Chree and I
wanted to change the trim paint color.
After some earnest negotiations with Tim, Brett, and Jason, and a
promise from me that Tim’s 13 May scheduled finish to our job would not be
delayed, Tim acquiesced to having all of the house trim repainted, recommending
we use Benjamin Moore Satin Impervo White Dove. I crashed through the door at
Countryside Carpet and Paint in Middlebury when they opened for business at
7:15. “I need two gallons of Satin
Impervo White Dove”, I tried not to shout.
While that was being mixed, I went over to the paint display and found
the White Dove color sample. “Oh, $#@!”,
I said to myself outloud, “that color looks far too much like what we already
have on the trim and Chree is NOT going to like it!” Turning to Janice Denu (one of the store’s
owners) I cried, “Help!!!!” Janice and I
pawed through the various “white” paints, trying to find one with a hint of
blue, without success. We did find
something called Chantilly Lace that had some black mixed with the pure white
base. Crossing my fingers, toes, legs,
and arms and holding my breath, I ordered two gallons of that color. Got back to Fern Lake at 8 to find Sean
already there for his mid-week inspection of work progress. Gave the Chantilly Lace to Brett and
Jason. A few minutes later, Chree
approved the new color! Halleluiah and
pass the Scotch!!!! (Gave the two
gallons of White Dove to Tim as a peace offering when he stopped by later to
check on how Brett and Jason were doing.)
Sonny and Brandon worked on door thresholds most of the day. Brandon also put a drywall backing strip on
the underside of the Ifelele railing caps so that the gaps between the top of
the drywall and the bottom of the wood can be sealed. Steve was here part of the day and finished
installing the guest bath shower control valves, then installed the cutoff
valves under most of the sinks. He also made
all of the domestic cold water piping connections in the mechanical room… which
will have to be redone because he forgot that a water filter needs to be
included in that piping. He also ripped
out the drain line in the shop lavatory because he remembered that the water
softener (which would have used that drain line) has to be situated in the
mechanical room vice under the stairs with the hot water heater. And, finally, he started to plumb the hot
water heater. Two steps forward, one
step back… Jeff Many stopped by
mid-afternoon to discuss some additional items we want for the garage doors…
and fixed our malfunctioning garage door remote control. (All he did was retrain the remote, something
I should have been able to do myself; how embarrassing!) After we cleaned the shop, Chree and I moved
all of the interior doors into that room, where Tim will be wet-sanding
them. As we were stacking the doors on
the special drying rack we’ve been using, the rack collapsed. This resulted in virtually every one of our
formerly-pristine doors getting dented by the steel rack tubes. The bad news is that, though the rack
collapsed in my direction, the doors did not, in fact, put me out of my
misery. With Sean’s somewhat reluctant
concurrence, Chree called our moving company in Virginia and asked them to
schedule our household goods delivery for Friday, 3 June.
4 May 2016
Kaleb, Matt, Brendin,
Jason, and Brett were here again painting away.
Tim stopped by mid-morning to check their progress. They got all of the trim and ceilings done
(with the exception of the storage room baseboards… that haven’t been installed
yet), plus they painted the walls in the guest bath, master bedroom, and master
bath. The master bedroom color is quite
vibrant (and that is probably a serious understatement). Now that we see the wall paint going on,
Chree and I have decided that we really don’t like the green overtones in the
“Anderson white” trim paint. More to
follow… Sonny finished putting on the
stair nosings and installed the casings around the two garage windows. He and Brandon also installed the Ifelele cap
on the main level half wall railing… which looks absolutely gorgeous. They planed the rest of my rough cut maple so
that Chree and I could select which boards will be used for thresholds. Steve and I ran PEX tubing through the
conduit down to the sauna, then he started to install the water control valves
for the guest bath shower. The Granite
Group brought all of the rest of our plumbing fixtures, which now take up every
available out-of-the-way nook in the garage and elsewhere throughout the house. Chree and I finished our part of the door
varnishing saga, i.e., there now are two coats of polyurethane on all six sides
of all 23 interior doors.

3 May 2016
Tim (for a couple of
hours), Kaleb, Matt, Brendin, Jason, and Brett were here for another very productive
day of painting. Kaleb and Matt put two
color coats on the walls of the first and second guest bedrooms, henceforth to
be known as the Red and Blue rooms, respectively. Brendin concentrated on priming the last of
the baseboards. Jason and Brett finished
all of the lower level trim and made a big dent in getting the second coat on
the upper level baseboards. Sonny and
Brandon spent most of the day crafting the Ifelele railing top caps, getting
the lower one installed. Sonny
manufactured the stair tread 1″ nosings out of
“scrap” poplar and installed as many as he could with the short supply of trim
screws on-site. The two carpenters also
spent an hour at the end of the day planing maple boards so that Chree and I
can pick the ones we want to use for thresholds. Somehow, a red oak board ended up in the
pile. Now we just have to figure out (1)
where it came from and (2) where to use it. Steve Poplawski, plumber extraordinaire,
stopped by for an hour mid-afternoon to scope out the remaining plumbing and
HVAC work he needs to do… supposedly starting tomorrow. I spent the morning putting the second coat
of varnish on the first side of the second set of interior doors. Chree and I “discussed” closet shelving with
Sonny right after lunch, with no consensus reached about the material to be
used. Chree and I went down to Marty
& Merry’s for another delightful evening of good fellowship, fine food, and
great cheer.

2 May 2016
Tim, Kaleb, Matt, and
Brendin were joined today by Jason Many (yes, of course he’s related to
Uncles Mike, Pikey, and Jeffrey) and Brett Rubright, two independent painters
who Tim brings on when he needs extra help.
The painting gang concentrated on getting a second coat on all the
window trim, prepping baseboards, and “painting” the shop ceiling with drywall
primer. Sean came by for a couple of
hours in the morning, doing a walk-through inspection with Sonny and Brandon,
during which they put together a preliminary carpentry punch list, i.e., a list
of items to be done before the house can be considered complete. Sonny manufactured a wood finish piece from
which the sun room chandelier will be suspended. He also manufactured doors for the wine
cellar rear access and the master bath / laundry clothes pass-through. Brandon started to manufacture pieces for the
railing top caps from the Ifelele (a tropical hardwood) that I brought back
from American Samoa in 1981… and have been saving ever since for this very
purpose. Now that’s what you call
staying ahead of the airplane! I spent
the morning putting varnish on the second set of interior doors. After lunch Chree and I headed north for our
weekly spending spree. We retrieved all
of our previously-ordered wall lights and floor lamps from The Lighting House
in Shelburne, in return for a largish check.
We cleaned out the entire supplies of 20 amp white Decora electrical
outlets at both of the Burlington-area Lowe’s… and still came up 10 short of
what we need for the house. We then met
Kevin Haight over at Trowel Trades in Essex Junction to select the masonry
products that will be used for the patio, an eight foot diameter flower planter
Chree wants in the middle of the patio, and an outdoor fireplace I also want on
the patio’s east side. We made those
selections in a bit of a hurry, as it was pouring rain at the time of our
visit, and all of the displays were, of course, outdoors. Hope we like what we picked when it gets
installed!
1 May 2016
Another quiet Sunday
morning cleaning Kate’s house and then the main level of the new house. After lunch, Chree and I went down to the
Home Depot in Rutland to procure all of the paint for the interior walls. The look on the paint-person’s face was
absolutely precious when informed that Chree needed 27 gallons of Behr Premium
Plus in an eggshell finish and assorted colors, plus a few odd quarts thrown in
for good measure. This was at 1
o’clock. The paint person responded,
“And you want this by 8 o’clock, too, I bet?”
Amazingly, before I’d even finished special-ordering a Kohler medicine
cabinet for the half bath, Chree came over to say that she had all the paint. Apparently, three other store staff had been
quickly summoned to the paint production process. Now, hopefully, all those colors will look
just as good on the walls as they did in the paint samples…
30 April 2016
Kaleb and Matt worked
six hours of overtime this morning, putting more paint on the main level
ceilings and then starting the first coat of paint on the two guest bedroom’s
window trim. Right after breakfast, I
tried to take to the Salisbury recycling venue the load of cardboard that is
completely filling (to overflowing) the Tacoma’s cargo bed. The man in charge there refused the load
unless it was cut up into 2 foot squares.
Get real! Tim stopped by
mid-morning to see how his guys were doing, arriving in time to referee further
“discussions” by Chree and me about wall paint colors. We released Tim after a few minutes to go
enjoy his day off, as our “discussions” looked like they were going to continue
for awhile… which they did. Chree and I
also cleaned all the slate tile areas and then covered those areas with a
protective cardboard floor covering, which should prevent them from getting
spotted by exuberant painters. Chree and
I spent most of the afternoon polyurethaning the first side of the rest of the
second batch of interior doors. Taking
one for the team, Chree forewent a concert in Middlebury, that she really
wanted to attend, in order to keep the varnishing project on track. After the varnishing was done, I applied
Durabond to an area just above the woodstove nook mantle that we decided (with
Tim’s help) should just be painted plaster vice a strip of wood (as originally
envisioned). I also repaired a
substantial rent in the drywall caused when the casing for the wine cellar
cleaning access was forced into place, obviously somewhat reluctantly.