Kevin
spent most of the day building the walkway from the front entry steps over to
the driveway, using the 1″ thick irregularly-shaped slate we procured for that purpose some time
ago from Vermont Specialty Slate. Kevin
used less than half of our stockpile for the walkway, so… With this walkway complete, the house is OFFICIALLY done, i.e., all
of the items in our original contractor specifications have been
completed. Mind you, there are still
quite a few projects on the Honey Do list that will keep Chree and me busy for
the foreseeable future… While Kevin was
working outside, I carved two holes in the kitchen desk / bookshelves area so that
I could rip out the phone jack box on the west wall (that turned out to be
quite awkwardly placed) and run the wires over to the phone jack box on the
north wall. Easy job! Now I just have to hide the evidence before
Chree gets back… I also carved a hole in
the north pantry wall, thinking to install a light switch to control the pantry
light in lieu of the motion-sensing switch that we don’t like. Remembered, at the last second, to offset the
hole so that the switch box I was installing would miss the switch box on the
other side of the wall (that controls the light over the kitchen desk /
bookselves). Don’t ya know, some (epithet
deleted) plumber put a vent pipe right where I cut the hole. With a wall stud just north of the vent pipe
and another wall stud just south of the desk / bookshelves switch box, there
was nowhere to put the switch I wanted to install, without getting totally
bizarre with the switch height above the floor.
So some more evidence to hide from wifely eyes.