27 April 2015
Spent the first part
of the morning doing more chainsaw work and the Kubota’s 160 hour periodic maintenance. Tyler Maynard arrived at 11 to review the
location changes I want for the septic system and wells. He didn’t like where I was proposing to
locate the leach field, but said the area where we originally wanted to put the
second well (up by the road on the north side of the driveway) would be quite
suitable for the field. He had me dig
four moderately deep pits in that area to verify the soil composition. After a
late lunch, backfilled the four pits, then culled through the lumber salvaged
from the old dock shack for material to be used in the sauna woodshed. Super chlorinated Delores’ fresh water tanks
and water lines today, hoping that might improve the hot water pressure. Finished that whole rigmarole, turned on the
faucets and got a weak stream on the heretofore strong cold water side and
virtually nothing, I say again, n∙o∙t∙h∙i∙n∙g, out of the hot water side. ^%$&#$ !!!! Fortunately for my continued sanity (not to
mention cleanliness), once I closed a system drain valve that I had
inadvertently left open, full pressure was restored to both sides.