22 April 2013


Amazing how much you can get done when not distracted by sub-freezing temperatures and sick vehicles. Got the in-ground posts, stringers, longitudinals, railing posts, and over half the deck boards installed for the next 24 feet of the walkway.  Chuck from Cararra Concrete stopped by early afternoon to see if a concrete truck could make it down the former stairway slope to the waterfront.  Answer: a definite maybe… and have him come back once the slope is graded smooth.