27 – 29 June

Back to Fern Lake via Connecticut with Chree and the dogs.  Stopped at Giddings Manufacturing in Pittsford on the way north to pick up the new driveway sign and mounting bracket.  Over the course of the two day trip, ALL of the frozen food in the cooler thawed, creating a major mess.  While Chree was dealing with that and getting settled, I took the Ranger up to Carrara’s for another 1,000 pounds of stone for making concrete.  Then we continued disassembling forms and bracing from the rock wall reinforcing concrete pour.