22 September 2018

Mike, Pikey, and Zach here most of the day roofing away. They finished putting panels on the east side and half of the north side.  Chree and I continued stuffing Delores with all of our worldly goods plus a few tons of food.

20 September 2018

Visited with Mike Many while walking Shlomo this morning.  Mike recommended raising the cupola base a few inches in order to accommodate the metal roof ribs and hip caps.  Back at the barn, careful measurements showed that the cupola, as built, wouldn’t have fit right even without the ribs and hip caps interfering.  Who designed that thing?  So added 2″ to the cupola’s foundation on the top of the barn roof, which should (note I said “should”) solve the problem.  Will have to cut off and remove the eight ¼″ x 7″ tie-down bolts and replace them with ¼″ x 9½″ threaded rods.  Loaded a bunch more “stuff” into Delores, including $107 worth of petrol. 

17 September 2018

Charles Goodrich came by mid-morning and took away all of the Goose Creek tools and staging.  Very sad!  I really had grown fond of the chop saw… and the 20 foot aluminum plank, though heavy, was very popular with the roofers.  Only things left are the wall jacks.  Jeff Many (Mike Many’s cousin) and Ryan Tarbell (Jeff’s son) from Green Mountain Door arrived late morning and spent many hours installing the barn’s 16 foot wide by 8 foot high overhead door, operated by a Liftmaster® ½ horsepower door opener. Jeff even programmed one of the Tacoma’s HomeLink® transmitter buttons to operate the new door… and gave me a key fob for the Kabota that does the same thing.  So high tech!  Gave the Kubota a bath, amongst other preparatory tasks for our upcoming annual logging trip to Calais, as Chree only likes to operate a clean log skidder.


16 September 2018

Mike Many and crew here in the morning and finished putting the metal roof pans on the south-facing roof, then got a little more than half of the east-facing roof done before being diverted to other pursuits.  Alex, Katy, and Devin headed back south at 11 after another most enjoyable visit.

15 September 2018

Katy, Alex, & Devin arrived in time for breakfast to commence a short fun-filled weekend visit: swimming, canoeing, kayaking, Frisbee golf, croquet, shooting, barbequing, the obligatory heart’s game, and a very interesting tour of the Omya marble quarry in Middlebury. Mike Many, Mike Many, Jr (Pikey), and Zach Saxe (who lives at the north end of Fern Lake) got here about 9 with the first pieces of metal roof edge trim.  Unfortunately, things went a bit downhill from there, as Mike and crew struggled until nearly 1 o’clock to get Mike’s forklift started, said forklift needed to hoist the coils of metal roofing material onto the de-coiler stand so that they could fabricate the roof pans.  The guys returned about 2 and started putting roof pans into place, getting the east half of the south-facing roof done by Labatt Blue time.

 


14 September 2018

Finished putting in the overhead door facing trim and applied a coat of paint, mostly to the Koma®.  Built a small workbench at the back of the barn.  Lake temperature still a refreshing 76°.

 

13 September 2018

Ripped the 1x8 Koma® that was delivered last week to a 6¼″ width, that being the theoretical width of the overhead door facing.  Why “theoretical” you ask?  ‘Cause the actual facing width measurements varied between 6⅛″ and 6⁹/₁₆″.  Using many quick clamps, was able to install the horizontal, very floppy, 16′ top trim piece by myself.  Also put in the right-hand vertical trim piece.