31 July 2012


Stayed up way too late hooked on the final chapters of The Coroner’s Lunch by Colin Cotterill… an excellent murder mystery (with touches of the occult) set in 1970’s Laos just after the Communists have taken control of the country.  When I finally got motivated this morning (extra strong Starbucks Breakfast Blend helped a lot), put the stringers and railing post (with deck light) on the in-ground posts I finished up with yesterday.  Then tackled the railing caps, railings, and toe caps for the first turn landing and the 8′ section of walkway that goes from the landing to the east side of the lower “driveway” gap.  The joints for those six pieces are all compound angles: 45° in one plane and 3½° in the second plane.  That’s why they make radial arm saws… though mine is an ancient and much abused Craftsman that probably wouldn’t recognize a ½ degree angle if it tripped over it.  At noon Tammy stopped by with her bill for the marriage-saving backhoe work she did… and admired the progress made since her last visit.  Mid-afternoon helped Marty install a window air conditioner in one of his west facing upstairs bedrooms, then headed into Salisbury and Middlebury to do errands, the most important of which was to replenish my Ben & Jerry’s supply get another section of ½″ PVC conduit for the low voltage electric line gap crossing trench.  Returned to Fern Lake just before 5 and decided to install the conduit, hook up the next deck light, and back fill the trench, all of which was done by swim call at 6:30.  Pizza, beer, and (need I say?) ice cream for dinner…

30 July 2012



Woke up at my “usual” time, circa 6:30, only to discover that it really was already 9 o’clock!  Guess that’s what happens when you get debauched and have two beers.  Finished digging the trench in which will be buried the low voltage wire to power the deck lights on the lake (or west, if you prefer) side of the lower “driveway”.  For obvious reasons, had to dig the trench below what will become the driveway grade level.  After awhile, felt that if the trench went any deeper on the upper end I’d have to start learning Chinese.  Surprisingly easy digging: mostly soft sand with only a few small rocks, though with lots of pesky roots.  Most un-Leicester-like!  That is until I got ⅔ of the way across and ran smack into a very large rock.  How large, you ask?  Though it was clearly labeled 600 pounds, you just can’t trust those Chinese.  Actual weight, once I got that sucker out of the ground, was better than 750 pounds.  Why not just go around the (fill in your own adjective) thing, you ask?  Well, I needed a place to put Perry’s 5-gallon water jug, and that rock seemed like just the ticket.  After the trench was finished, dug the holes for the next two in-ground posts.  Took me a couple of trials before they were where they should be, somewhat complicated by a 200 pound rock that was exactly where the southern post needed to go.  The good news?  Once that rock was liberated from the soil (child’s play compared to its cousin from the morning), not much more digging was needed before that hole was deep enough for the 4x4 post.

29 July 2012


Are you wondering why it took me most of the day to install two 8′ long longitudinals and 17 deck planks in the next section of the wooden walkway?  Here is just one example of how things went today: needed to clamp in place the 2x4x12 that serves as a temporary guide for aligning the deck boards.  Only there was a root from a tree stump in the way where the lower end of the 2x4 needed to go.  In order to cut the root without totally destroying my limb saw and/or root cutting ax, I had to remove a 75 pound boulder that was underneath the root… and held firmly in place by said root and several smaller, but not petite, sisters and brothers from the Igneous family.  A half hour of vigorous toil later, all was clear to start chopping.  During one of my more Bunyanesque back-swings with the ax, managed to clobber the deck light that I’d just installed on the nearby railing post.  Double-bladed root cutting ax vs. cheap tin light, you can guess who won that battle.  The good news is that I now have extra easily-lost mounting screws and an extra T-5 7w light bulb for the deck lights.  So, an hour and a half after beginning the one minute job of clamping a 2x4 in place, I was ready to start putting down deck boards.  Do you also wonder why I’m having more than one beer tonight in front of the campfire?  Finally figured out how to take elevations (using my poor-man’s transit: my father’s ancient leveling sight steadied on Tasi’s old camera tripod) with nobody available to hold the range rod.  My steel rock-removing bar and a quick clamp do the job quite nicely, thank you very much.  Also figured out that the walkway will need to continue on the other side of the lower “driveway” (the level area that will be used to access the rear of the house and the septic tanks located there) as though it crossed that 20′ gap with the same 7.5:1 slope it has everywhere else.  That way the walkway will only be 15″ or so above ground level at the next turn… a much more reasonable situation than if I’d stayed with my original plan to have the walkway cross the lower “driveway” with only a 6″ slope from one side to the other.

28 July 2012

Continuing the saga of missing things: as I was putting away tools this evening, noticed that the chuck key was not where it is always kept in the holder on the Bosch hammer-drill.  Not a big deal so long as henceforth I only want to drill ¼″ holes 8″ deep with a ship auger bit.  Put the deck boards on the first turn of the wooden walkway this morning.  Spent the early part of the afternoon surveying the next section of the walkway, which is extremely challenging without someone to hold the range rod while you shoot the elevation from 75 feet distant.  Bottom line (if I can believe my own observations and calculations… never a good bet): the walkway will be 3 feet up in the air at the next turn.  Hmmm….  Moved a fair amount of dirt and rocks out of the way, then put in the in-ground posts, stringers, and railing post for the next piece of the walkway.

27 July 2012


Rained hard on and off all night; awoke to a dreary, damp day, so decided to do some “inside” jobs for the first few hours.  No mice, sober or otherwise, in either trap.  Attempted to repair the bedroom blind, but the string I brought from Virginia for that purpose didn’t work.  Back to the drawing blinds board on that project.  Sharpened the chain (which was seriously abused cutting roots a couple of weeks ago) and did some not-so-periodic maintenance on Mr. Jonsered.  Then spent the balance of the day building the framework for the first turn on the wooden walkway.  Changed the construction design.  Instead of putting in two in-ground posts with an above-ground railing post secured between two stingers, put in one regular in-ground post and then put the railing post into the ground as well, with two stringers tying the two posts together.  The hard part is getting the top of the railing post at the right height, but that’s why they make Sawzalls.  Now that Chree and the dogs are gone, so are the deer flies.  Not many mosquitoes around, either.  Mid-afternoon misplaced my brand new 12′ tape measure.  Looked everywhere and couldn’t find it!  Called Chree and told her I needed a hug, but she had neither my tape nor spirit level (also among the missing).  Found the tape when I sat down in the Ranger; was in my back pocket the whole time...

26 July 2012

Left Virginia at the crack of dawn where the humidature (effective temperature given the humidity) was supposed to reach 109°F today.  After hiking a few feet on the Appalachian Trail yesterday, felt good to sit down for awhile… like maybe five minutes.  Even with moderate to heavy traffic the whole way, and having to go all the way around DC on the I-495 beltway ‘cause somebody forgot to put up a sign that says you can’t get to I-295 from anything but the right-hand lane which you have to enter before the Eisenhower Road exit (5 miles earlier), arrived in Brandon a “mere” 8½ hours (and 1,600mg of Ibuprophen) later.  Temperature inside Delores was a frigid 67°.  Had to open some windows to warm the place up!  Lake temperature is 79°… maybe I’ll sleep there tonight.  First of the Kingsley corn for dinner… yummy as always.  Opened the utensil drawer to get some tongs for removing said corn from the cooking water and discovered beaucoup mouse droppings and a wine bottle stopper that is a lot shorter than it used to be.  Set up both humane traps in hopes that the tipsy mouse (mice?) will be lacking judgment tonight.

18 July 2012

Back to Virginia.  Due to reported horrendous traffic backups on I-95, took the Merritt Parkway to the Tappan Zee Bridge, then down I-287 along the route I normally take from Vermont to Virginia.  Considerably longer distance and time, but that route also avoided traffic battles with the Cross Bronx “Expressway” and the New Jersey Turnpike.