7 May 2012

Except for one piece of 4½″ white trim at the top, THE NORTH WALL IS DONE!!!!  Having Bob Ross’ scaffolding to work from made all the difference between a job darn near impossible and a job that took half as long as expected, was totally safe, and resulted in minimal wear and tear on this olde body. Thank you, thank you, thank you Bob and Perry (chief procurement official and man about town).  With two shingles left to put on the final course, Marty came up the hill to invite me to a barbecued leg of lamb dinner… come right now and come as you are.  Had him take some pictures while he was here, then quickly finished the shingling and headed north at a trot.  Merry wisely had me use the laundry room deep sink to remove at least some of the grime from my hands… which will need a change of skin before turning back to flesh colored from gray.  The lamb was d-e-l-i-c-i-o-u-s… and an Otter Creek Cooper Ale slid down real easy, too!  And, surprise, surprise, we had Butter Fudge Fingers and ice cream for dessert.  Dinner ended just at sunset, so I returned to work in the waning light to put stain on that final course of shingles, then secured the worksite for the heavy weather expected to roll in tonight and persist through tomorrow.  Lesson learned: the Man Cave is so airtight that drying the shingles in there over the winter just didn’t happen; should have put the shingles in the woodshed that is, after all, built especially for drying wood.  Second lesson learned: sun and air drying loose shingles (i.e., not tightly bundled like they come from the lumber yard) causes them to warp in all sorts of interesting, but not good, directions.

6 May 2012

Got another course of shingles put on before it was time to take the Ranger up to Junction Auto for restorative welding and pocketbook draining.  Got there 20 minutes earlier than previously arranged only to find Alverta already waiting.  We returned to Fern Lake by 10:30 and I set Alverta up with a cozy work station in the sun where she could apply stain to the shingle butt end grain… a critical but very time-consuming step.  While she did that, I put up another course of shingles.  Then it was time for a huge lasagna and butter fudge finger lunch.  This being a union shop, after lunch Alverta got to take a nap while I applied stain to shingles on the wall.  Perry stopped by to give us each some wild leeks that he had harvested in his secret undisclosed location.  (Hint: it starts with “C” as in Cheney.)  He went away with a food offering for Lynne.  Alverta headed back north at 5:00, declaring that she’d had so much fun she might even come back again… next year.  I continued working until I couldn’t go any higher without adding the next level of scaffolding… a good time to quit.  All told, got seven courses put up today, with only six more to go on this wall.  For some reason I’m just not hungry for dinner…

5 May 2012

Used up a fair number of the “ruined” shingles (the ones with the Lowes Special Wrong Stain) in the starter course above the shed garage door.  Just as I was finishing that work, Perry arrived for our scaffolding liberation mission.  By mid-morning we had erected a wonderful platform just the right height for me to work sitting down all day, putting on an additional five courses of shingles on the north wall.  Doing the math, that works out to just over 30 square feet of progress for the day… not too shabby until you consider that the shed has just over 600 square feet of exterior surface area.

4 May 2012

My reputation for punctuality is in shreds!!!!  Was supposed to meet my mother and brother in South Burlington at 11:00.  At 11:00 I was still in Charlotte (10 miles south) and both of them were already where we were meeting.  Didn’t arrive myself until 11:15, which I’m sure my family (and friends?) will never let me forget.  As the saying goes, “One oh, crap cancels out ten attaboys”.  Had lunch with my mother at Pauline’s Restaurant, one of her favorites, but which I had found to be pretty mediocre previously.  Not anymore!  A fabulous repast for a very reasonable price.  Before departing for points north (and the reason I was running late) got a second woodshed door sheathed with Advantech and then put another course of shingles onto the south wall of the shed.  That done, looked at the time and said, “Oh, crap (or words to that effect), I was supposed to have left 15 minutes ago and still have to change.”  Got back to Fern Lake at 3:30 and went back to swearing shingling. Opened the lower level garage door and found the man cave to be very cool and dry.  A half hour later it looked like someone had taken a fire hose to the walls… they were literally dripping with moisture.  This might explain why some of the cedar shingles never dried out over the winter… and why the Ranger has an advanced case of body rot. Perry came over after he finished work to inspect recent accomplishments and provide his standard consulting services vis á vis work in progress.  He also said that he can borrow some scaffolding for this coming week if I want it for working on the higher reaches of the north wall.  Answered with a strong affirmative (or words to that effect).

3 May 2012

Put the ⅝” Advantech backing on one of the door frames… which added considerably more poundage than I was expecting.  Think I’d better use three hinges on each door instead of the two I had planned on.  Then put some Home Slicker on the shed south wall, finagled the insect screen into place at the bottom, and started laying shingles.  The critically important trick is, of course, to lay each course exactly level, with each shingle spaced exactly 3/16″ from its neighbors, and each course exactly 5 1/16″ apart.  That’s a lot of exactlies and no close enoughs.  Started out trying to use my level and quick square to position the shingles… and quickly ran out of hands. Then dawn came to Marblehead… and I snapped a chalk line between the story board marks at the end of each row and, le voilá, positioning the shingles could be done quickly and easily with one hand, leaving the other hand free to handle the pneumatic stapler.  By quitting time had five courses done and very sore knees.  Then scurried around like crazy for an hour trying to get Delores presentable before Marty and Merry arrived for the grand tour and barbecued spareribs with all the fixin’s.  As always, good food, good wine, and great company.

2 May 2012

Built a second frame for the woodshed doors while waiting for Agway to open. Stephanie Sturtevant called to say she would not be coming to assist me today... assistance that is sorely needed if I’m to make any progress with siding the east wall and the upper reaches of the north wall. At the appointed hour, Delores and I waltzed our way into Middlebury for another $40 worth of propane. While the weather for the next few days is supposed to be warmer, colder weather is forecast for early next week and running out of propane makes Doug a very cold camper.  Returned to Fern Lake by 10:30 and started putting up cedar shingles on the north wall.  By the end of the day had reinstalled the 16 courses that I ripped down due to having the wrong stain.  The Weatherizing Stain, in sharp contrast, looks to be exactly what we wanted.  So I’m now back to where I was on April 24th.  Marty came up to inspect progress, so having a second strong back available, we moved the radial arm saw from next to the shed to the south side of the driveway.  Two reasons: the saw will be in the way when I shingle the shed south wall and, instead of being protected from rain underneath the roof overhang, the rain from the roof was landing directly on the saw (tarped, but still not good).

1 May 2012

A nasty rainy morning, perfect for reading an Orson Scott Card novel in the waiting area while Todd Desabrais did his magic with the Sienna windshield.  He even transferred the inspection sticker to the new glass.  Returned to Fern Lake shortly before noon, surmised that Delores somehow heard from yesterday’s blog about putting her back into the repair shop, ‘cause now she’s seriously trying to kill me.  “How so?”, you ask.  Well, found a puddle of water on the counter next to the stove.  “Now that’s kinda peculiar”, I says to myself, “to have a puddle of water on the counter like that.  Wonder where it’s comin’ from?”  Don’t ya know, that water was coming out of the electrical outlet into which are plugged the coffee maker and the toaster.  Delores, up to her old tricks… again!  “Why don’t  you have an English muffin with your coffee”, she says, “seeing how it’s raining outside this morning?”  Kazzzap!  Having foiled her evil plot (had a Pop Tart instead), put paint on the woodshed door trim that was procured yesterday… which took forever to dry due to the 100% humidity.  When the rain finally abated enough to uncover the radial arm saw, built a jig for making the frames for the woodshed doors by screwing some 2x4’s to the shed floor. As the jig is exactly the size the doors need to be and is perfectly square, there is a better than even chance that the assembled doors will fit the opening where they will be hung.  Got one done, made entirely out of stock from my used but good, if maybe a bit cement stained, pile.  Also designed a jig for using my router to precisely cut the hinge pockets for the woodshed doors.  Now if I only had my jigsaw (in Virginia, of course) I could actually make the jig…  The we could all dance a jig, ‘cause the door hinges are mounted correctly. Living the motto, “Waste not, want not”, sawed up a bunch of ⅝″ Advantech “scrap” (left from sheathing the shed roof) to make the backing boards that will cover the woodshed door frames and onto which the cedar 1x4’s will be glued and nailed.  Exciting work, but somebody has to do it.