James Ploof, Burt
Wedge, and Tyler Truman arrived first thing and spent the morning repairing the
patio base erosion problems. They also
dug out the 3′ x 12′ area in which Kevin will be building the outdoor fireplace
and wood storage structure. In the
afternoon, the Ploof Excavating team started grading off the backyard, which we
want to be absolutely smooth and level.
Using their fancy laser-leveling system, we determined that another
course of rocks would have to be added to the monster lake-side retaining wall
so that the yard could be made flat at the same elevation as the tops of the
septic tanks’ manhole covers.
Fortunately, rocks of the right size just happened to be lying around… At its peak, that wall now is 16 feet high!