A very productive day…
with perfect weather! Ian and Ben got
here at 7 and resumed putting in mid-span joist braces. I finished cutting the special sloped joists
that will be under the main entry porch. Sean appeared bringing gifts from
Goodro’s: lots of hangers for me to install where joists were attached to other
joists. Sean, Ben, and Ian installed the ¾″ (technically it’s only 23/32,
if you want to quibble) AdvanTech® tongue & groove
subflooring for the main level of the house.
Ty came to join the fun mid-morning.
Because the architect (that would be me) specified that the subfloor be
both glued and screwed (vice nailed) to the joists, you’ll never guess who got
assigned to put in the 2,000+ screws needed to hold down 1,640 ft2
of AdvanTech®? Went through
four charges on the battery for my impact driver (and my back may never be the
same) before that job was done… and I had help from Ty and Ian at various
points during the almost-all-day, quite brutal process. I can hear the bed calling already…